Tekol Engineering;
Mechanical Contracting Project Planning Our working order in this field can be summarized, but not limited, as follows.
It is appropriate to examine design and project studies separately.
The following sequence of work is applied in our design work.
* Preparing descriptions of the designed structure,
* Preparation of prototype drawings,
* Preparation of the model to be produced with corrections,
* Preparation of production plan, preparation of production and test procedures,
* Personnel training,
We provide the following services in project work.
* Preparation of disclosure report, drawings and calculations,
* Preparation of recipes and drawings for special productions,
* Preparation of programs for programmable equipment,
* Preparation of technical specifications and unit price descriptions,
* Unit price analysis and preparation of bill of quantities,
* Preparation of contract sample.